Day 1 ( 11th March 2010)

We were faced with a problem on this date, the problem was that all of our previous recordings were erased or lost further on in the tape, this put us at a disadvantage because we have lost our footage therefore we have had to reschedule and re-film the scenes, this has put us in a very bad position, as we may have to face the fact that we will be behind, therefore meaning that everything may end up being done past the due date but we will do everything in our power to finish on time...

Day 2 (15th March.)


Following our big setback, we managed to finish all of the filming in a space of 3-4 days, and then we were ready to capture and upload whilst editing.(TO BE CONTINUED)